ATTENTION:
Base. curb and gutter repair is underway on N 138th E Ave between the Owasso Expressway and East 106th St North. Contractors will also be milling existing asphalt and overlaying new asphalt through March 19th.
Drivers should avoid the area if possible, However if you must drive in the area, expect one lane traffic at times, flagmen directing traffic, and detours as required by the work being performed. Use extreme caution as construction equipment and personnel will be working in the roadway. Obey all signage.
We apologize for any inconvenience, however this is a necessary part of the construction process.
SEE LOCATION MAP